How are Data Centers Built?

Published in Data Center Construction 3 mins read

Data centers are purpose-built or adapted facilities designed to house critical computing infrastructure. Building a data center is a complex process that involves careful planning, site selection, and the installation of robust physical and IT systems.

Site Selection and Location

The first crucial step in building a data center is choosing the right location. This decision is driven by various factors, including access to reliable power, network connectivity, space, and environmental considerations.

According to some information, data centers can be constructed in different types of locations:

  • Reconstructed Buildings: Some data centers are built in reconstructed factories or warehouses. These existing structures can sometimes be adapted to meet the unique requirements of a data center, potentially saving time compared to new construction.
  • New Construction near Cities: New data centers are often built in the areas around large cities. This strategic placement is chosen because these areas offer:
    • Enough open space: Required for large-scale facilities.
    • Connection to an expansive, established electrical grid: Essential for providing the massive amount of power needed to run servers and cooling systems reliably.

Other factors influencing site selection include proximity to fiber optic networks for high-speed data transmission, the risk of natural disasters, and local regulations.

The Construction Process

While the specific steps can vary depending on whether a building is being repurposed or constructed from scratch, the general process of building a data center includes several key phases:

  1. Design and Planning: Detailed architectural and engineering plans are developed, outlining everything from the building layout and power distribution to cooling systems and security measures.
  2. Site Preparation: The chosen site is prepared, which may involve clearing land, excavation, and laying the foundation.
  3. Building Structure: The physical building shell is constructed, designed to be secure, resilient, and capable of supporting heavy equipment loads.
  4. Installation of Critical Infrastructure: This is a major phase involving the setup of essential systems:
    • Power Systems: Installing reliable power feeds, backup generators, and uninterruptible power supplies (UPS) to ensure continuous operation.
    • Cooling Systems: Implementing sophisticated cooling solutions (like HVAC units, chillers, and aisle containment) to manage the significant heat generated by IT equipment.
    • Network Connectivity: Laying fiber optic cables and installing networking equipment to connect the data center to the internet and other locations.
    • Security Systems: Installing physical security measures (like access controls, surveillance) and planning for cybersecurity infrastructure.
  5. IT Equipment Installation: Once the physical infrastructure is ready, servers, storage devices, networking gear, and other IT equipment are moved in and installed in racks.
  6. Testing and Commissioning: All systems are rigorously tested to ensure they function correctly and meet performance and reliability standards before the data center becomes operational.

Building a data center is a complex project that requires significant investment and expertise in construction, electrical engineering, mechanical engineering (for cooling), and IT infrastructure.

Data Center Location Types

Type of Construction Typical Location Key Advantages Mentioned in Reference
Reconstructed Factories or Warehouses Potentially faster build time by adapting existing structure.
New Construction Areas around large cities Access to open space and connection to expansive, established power grid.

Building data centers involves strategic location choices, often balancing the reuse of existing facilities like warehouses with the need for new construction near urban power hubs, followed by the meticulous installation of power, cooling, and IT systems.