While not precisely $55 million, Tropicana Field can be repaired for an estimated cost of approximately $55.7 million, according to a comprehensive assessment of recent hurricane damage. This detailed evaluation concluded that the home of the Tampa Bay Rays remains structurally sound.
Detailed Assessment and Repair Scope
A thorough 412-page report released by the City of St. Petersburg determined that despite experiencing hurricane damage, the integrity of Tropicana Field's structure is intact. The necessary repairs are projected to cost about $55.7 million. These repairs are aimed at restoring the facility in time for the 2026 Major League Baseball (MLB) season.Key findings from the assessment include:
- The stadium's structure is fundamentally sound.
- The estimated cost for all necessary repairs is $55.7 million.
- Repairs are planned to be completed before the start of the 2026 baseball season.
- The damage assessment was extensive, involving a detailed report outlining the necessary remediation efforts.
The feasibility of repairing Tropicana Field for a cost in the ballpark of $55 million is confirmed by this report, with the specific estimate being slightly higher. This indicates that a significant investment is required to restore the stadium to operational standards following the damage.
Repair Cost Overview
For clarity, here's a summary of the key financial and structural details:
Aspect | Details |
---|---|
Estimated Repair Cost | $55.7 million |
Structural Integrity | Found to be structurally sound |
Damage Source | Hurricane damage |
Target Completion Date | By the 2026 MLB season |
Assessment Scope | Detailed 412-page report |
This estimated cost encompasses the necessary work to address the damage and ensure the stadium's readiness for future seasons.